All teachers and students in the Live Dealer Games:
Due to the low temperatures recently, some teachers and students in our Live Dealer Games have reported heating issues to the Live Dealer Games through different channels. We first express our deep apologies to all teachers and students. Due to various reasons, problems such as lack of heating occurred after the official heating.
1. Various tasks to ensure Live Dealer Games
The logistics group attaches great importance to winter heating work and puts the warmth of teachers and students in the Live Dealer Games first. Vice President and General Manager of the Logistics Group Han Yue convened several special meetings with relevant persons in charge to formulate heating work charters, discuss actual work plans, and require all departments to work together to ensure efficient and orderly development of winter work.
After the heating work ended on March 15, 2018, the logistics group held a heating summary meeting to analyze and summarize the problems that occurred in the heating work of the previous year and form an emergency plan to ensure the smooth implementation of the heating work in 2018-2019. Previously, the logistics group also used the summer vacation to perform equipment maintenance on the heat exchange stations and water distribution stations in the three districts of the Live Dealer Games to ensure the normal operation of the thermal facilities.
In view of the situation that the campus heating pipe network has been used for too long and has many leakage points in the pipe network, our Live Dealer Games logistics group invested 5 million yuan to implement the secondary heating pipe network renovation project. The project started on September 29, thanks to the unremitting efforts of the construction staff day and night, and was finally connected to the entire network on November 4, with a total of 5.46KM of pipelines transformed.
On the basis of ensuring the normal operation of Live Dealer Games pipelines and facilities, the logistics group has prepared a Live Dealer Games plan in advance. The Power Department held the "2018 Live Dealer Games Work Mobilization Meeting" on November 10 to make unified arrangements for Live Dealer Games this winter and next spring. It announced the specific personnel arrangements for Live Dealer Games this winter and divided them into regions, and required Live Dealer Games personnel to standardize operations, cooperate closely, and do a good job in Live Dealer Games.
2. Work plan for the next stage
In response to the current Live Dealer Games problems, we will start from the following aspects: First, continue to communicate and negotiate with Taiyi Palace Live Dealer Games Company to ensure that the temperature of the Live Dealer Games hot water meets the requirements; second, call in maintenance workers to re- clarify job title
Teachers and students, with the hard work of all employees of the logistics group, the construction of the Live Dealer Games's heating facilities has been greatly improved. However, due to poor foundation, weak foundation, and large historical debts, many problems still occur in the heating work. This requires a thorough process.
Logistics Group