The renovation of old boiler dust collector equipment is a systematic project involving metal structures, machinery, and electrical appliances. The amount of renovation work must be determined based on the tonnage of the boiler. Therefore, according to the transformation status of the three zones, the heating tests will be carried out in sequence.
1. It is scheduled to conduct a heating bet365 sports betting platform on the heating range of the No. 3 boiler room in the East District on the afternoon of November 8th. Please notify each apartment in writing.
二, The heating range of the boiler room in the southern district is scheduled to be tested on the afternoon of November 9th. We hope that all residents will pay attention to the bet365 sports betting platform.
三, It is scheduled to conduct a heating bet365 sports betting platform on the heating range of the No. 2 boiler room in the East District on November 10.
4. The heating range of the No. 1 boiler room in the East District is scheduled to be tested on November 10.
5. It is scheduled to conduct a heating bet365 sports betting platform on the heating range of the West District boiler room on November 11.
6. Precautions:
(1)、In each building and in each household, please remove any indoor items that are close to heating facilities as soon as possible to avoid damage.
(2) If any apartment or teaching building undergoes internal renovation, such as changing the heating package facilities, please ask the Infrastructure Department to take prompt measures to prevent water leakage.
(3). Do not use the air conditioner during heating. After inspection, if air conditioning is used during the heating period, it will be announced on the campus website.
(4) If there is any problem with the heating facilities in each building or household, please call the repair hotline.
Repair phone number:
①, North side of East District (Boiler Room No. 2, East District): 85891150
②, South side of East District (Boiler Room No. 1, East District): 85891140
③, Female Apartment in East District (Boiler Room No. 3, East District): 85891153
④, West District (West District Boiler Room): 85898973 85892544
⑤, South District (South District Boiler Room): 85898506 85892534
Office of the Leading Group of the Western Translation Thermal Renovation Project
November 8, 2016