• Principal’s mailbox
  • Report by petition
  • One-stop service
  • bet365 app download rule.fileNumber
  • bet365 online live casino
News bet365 online live casino

Vice President bet365 online live casino Zhi organized a "look back" on the rectification of fire safety supervision and spot inspection issues in the catering center

Author: Meng Wei Editor: Ma Lijuan Source: Security bet365 online live casino Published: 2019-12-03 Clicks:

November 28,Vice President bet365 online live casino Zhi Organization and Infrastructure Department、Security Department、Relevant comrades in charge of the Third Industry Office,And the person in charge of the catering center contract、The person in charge of the fire protection construction unit and the technical personnel conducted a "look back" inspection on the rectification of the fire safety supervision and spot inspection problems in the catering center。

This "look back" inspection on the rectification of fire bet365 online live casino supervision and spot inspection issues in the catering center,This is the completion of the rectification of 19 problems in 4 categories in the fire protection facilities of the catering center recently discovered by the Chang'an District Fire Brigade inspection team,According to "Listing Rectification、Requirements for itemized cancellation number,A special inspection based on the rectification carried out by the construction unit。

In the fire control room of the catering center,Inspectors separately inspected the automatic fire alarm system、Smoke prevention and exhaust system、Fire emergency broadcast、The fire sound and light alarm has been operated manually and automatically;In the fire pump room,Separately install the inlet and outlet pipes of the fire water tank、Float valve、Glass water level gauge、The rectification status of fire water pumps was inspected;While inspecting the self-injection pressure stabilizing facility on the roof of the catering center,bet365 online live casino Zhi requires the temperature to continue to drop with the coming of winter,Insulation work must be done on the roof and exposed fire-fighting facilities and fire-fighting pipes,Prevent fire-fighting facilities from being damaged or fire-fighting water sources from freezing due to cold weather。

At the end of inspection,bet365 online live casino Zhi fully affirmed the organization of this inspection,He pointed out,This “look back” is an inspection of the rectification work,It is also a practical training for equipment operators,Achieved the scheduled goal。

After requesting rectification of the four problems found during the inspection,bet365 online live casino Zhi emphasized,First, it must be combined with the upgrading and transformation of the fire protection system,Continuously improve the construction of fire protection facility management system;The second is to comply with fire safety inspection requirements,Continuously complete various fire safety inspection records,Establish and improve various fire safety files and ledgers;The third is to follow the operating procedures of various fire protection facilities,Perform regular inspection and testing of fire-fighting equipment,Ensure that fire protection facilities are on standby at all times。

Vice President bet365 online live casino Zhi organized a "look back" on the rectification of fire safety supervision and spot inspection issues in the catering center

Share to: